Elastic demand means that consumers are sensitive to price and that increased prices can lead to lower sales. There isn't enough information to fully answer this question. We don't know how elastic the demand is. If the demand is only slightly elastic, the increased price and lower demand could still equal higher profits.
Answer: B
Explanation:
A vertical integration is where a company owns another company in the same production line.
For example a company that bakes bread has a farm where wheat is cultivated, a marketing company and retail locations for the sale of the bread.
The advantages of Vertical integration include:
a. It reduces costs.
b. It increases efficiency.
c. It gives the firm greater control of the production process.
A major disadvantage of vertical integration is it requires huge capital outlay.
The design is shown in the attached picture. An equilateral triangle has sides that have equal measurements. On the other hand, a vertex is the terminal point of at least two line segments. Therefore, when you join three equilateral triangles sharing a common vertex, that simply means that they have a common point.
Answer:
<u>c. exposing himself to unlimited personal liability.</u>
Explanation:
One major characteristic of sole proprietorship being the individual is sole recipient of profits and sole bearer of all risks and liabilities.
A sole proprietor bears unlimited liability in the sense that, in case of bankruptcy, the proprietor's personal assets can be taken away to repay debts owed by him.
Though a proprietor also remains the sole recipient of all gains, similarly the proprietor is also exposed to unlimited risk.
Thus, the correct option is, c. exposing himself to unlimited personal liability .
Answer:
The delivery cycle time was 26.9
Explanation:
The delivery cycle time is computed as:
Delivery cycle time = Wait time + Throughput time
where
Wait time is 13.6
The formula for computing the throughput time is as:
Throughput time = Move time + Process time + Queue time + Inspection time
where
Move time is 3.3
Process time is 2.7
Queue time is 7.0
Inspection time is 0.3
Putting values above:
Throughput time = 3.3 + 2.7 + 7.0 + 0.3
Throughput time = 13.3
Now, putting both the values above:
Delivery cycle time = 13.6 + 13.3
Delivery cycle time = 26.9