1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
oksian1 [2.3K]
3 years ago
15

Find the unknown side length

Mathematics
1 answer:
Westkost [7]3 years ago
3 0
For any right triangle, we can use the Pythagorean Theorem. The Pythagorean Theorem states that for any right triangle, the legs when squared and added together will be equal to the hypotenuse squared.

In mathematical notation: a^2 + b^2 = c^2

Where the variables a and b are the legs and the variable c is the hypotenuse.

Because we know the two side lengths of the triangle, we can solve for the unknown side.

We know the length of one of the legs and the hypotenuse.

Plug in the values.

10^2 + b^2 = 24^2 \\ \\ 
100 + b^2 = 576 \\ \\ 
b^2 = 476 \\ \\ 


b = \sqrt{476}

So, the square root of 476 is the unknown length.
You might be interested in
True or false cause I honestly forgot
fenix001 [56]

Answer:

false

Step-by-step explanation:

5 cant be put into 2

7 0
3 years ago
Read 2 more answers
Write each power as a product of the same factor. Then find the value.
Leona [35]

Answer:

its answer is option b 15.625

4 0
3 years ago
What does x equal if the equation is x+2.62=6.37
KengaRu [80]

Answer:

x=3.75

The drawing will help

5 0
4 years ago
Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every
Nutka1998 [239]

Answer:

25 seconds

Step-by-step explanation:

Hi there!

In order to answer this question, first we need to know how many bolts per second are produced by each machine, this can be known by dividing the number of bolts by the time it takes.

For machine A:

A = \frac{120 bolts}{40 s}= 3 \frac{bolts}{s}

For machine B:

B = \frac{100 bolts}{20 s}= 5 \frac{bolts}{s}

So, if the two machines run simultaneously, we will have a rate of prodcution of bolts equal to the sum of both:

A+B=(3+5)\frac{bolts}{s}=8\frac{bolts}{s}

Now, we need to know how much time it will take to producee 200 bolts, to find this out we need to divide the amount of bolts by the production rate:

t = \frac{bolts}{ProductionRate}= \frac{200 bolts}{8 \frac{bolts}{s} }

The <em>bolts</em> unit cancell each other and we are left with <em>seconds</em>

t = \frac{200}{8} s = 25 s

So it will take 25 seconds to produce 200 bolts with machine A and B running simultaneously.

Greetings!

4 0
4 years ago
Read 2 more answers
What is the slope of the line?
Evgesh-ka [11]
The slope of the line is 7/4
7 0
3 years ago
Read 2 more answers
Other questions:
  • What is the image point (-2,-7) after a translation right 4 units and down 2 units
    6·2 answers
  • If f(1)=3 and f(n)=-2f(n-1)+1,then f(5)=
    15·1 answer
  • The sum of two circles is 80 pi square meters. Find the length of a radius of each circle if one of them is twice as long as the
    15·1 answer
  • Which equation represents direct variation?<br> A) y=3x<br> B) yx=3<br> C)y=3x^2<br> D) y=3x^3
    7·1 answer
  • I DON'T KNOW WHAT TO DO WITH THIS. HELP
    9·1 answer
  • What is 30/25 as a percentage?​
    6·2 answers
  • Amelia was showing off her basketball skills. She scored a total of 14 shots for a total of 32 points. How many 2 point and 3 po
    14·1 answer
  • Adam had -$76 in his account. He then deposited $322. How much was in his account after his deposit?
    6·1 answer
  • How many solutions does this equation have 8x - 4 = 2(4x - 4)
    15·2 answers
  • Consider the circle shown with center O and points A , B , C , and D on the circle.
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!