1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Rama09 [41]
3 years ago
11

What is the diffrence between the the grassland and the savanna biomes

Computers and Technology
2 answers:
Phoenix [80]3 years ago
6 0

Answer:

The savana is dry and barren ussally only have a couple of rivers. grass lands have more life and green with tress to the side

Explanation:

sergey [27]3 years ago
5 0

Answer:

The term "savanna" is often used to refer to open grassland with some tree cover, while "grassland" refers to a grassy ecosystem with little or no tree cover.

Explanation:

You might be interested in
Since the 1970s, local tv newscasts have developed a similar look. that's because
professor190 [17]
<span>(news doctors, consultants) said people should be young, attractive, smile and look happy.</span>
6 0
4 years ago
Giving reasons for your answer based on the type of system being developed, suggest the most appropriate generic software proces
soldi70 [24.7K]

Answer:

For the university accounting system that replaces an existing system the appropriate generic software process model is Waterfall model

This is because the requirement of the system can be predicted in advance because of the existing system and secondly, this a mission critical system and the requirement are stable and reusable

For the  interactive travel planning system that helps users plan journeys with the lowest environmental impact the appropriate generic software process model is Prototype Model

This is because the user's requirement may likely change and fast delivery is essential to be implemented and for this the prototype model can save time of development to focus on essential functions first.

Explanation:

In order to get a better understanding of the answers above let define the concept of

Waterfall Model:

   We can define waterfall model as a type of software development approach that explains step by step development method, this software development approach consist of five to seven steps and each step is characterized by different tasks and objectives and these steps combined together explains the the life cycle of the the software development process.

Prototype Model

   We can define prototype model as a type of system development approach whereby an estimation(i.e the prototype) of the final system is constructed,tested and adjusted until the desired result is obtained and the the main system is then constructed with the specification of the perfect estimation or prototype for example when constructing a bridge the engineer apply this methodology by first constructing an estimation or prototype of what the bridge should look like and then various test and adjustments are  been carried out on this prototype bridge afterward he main bridge is been constructed with the specification of the prototype.  

8 0
3 years ago
Assume you have a variable sales of type Money where the latter is a structured type with two int fields, dollars and cents. Wri
7nadin3 [17]

Answer:

The answer to the question is included in your question. I guess you need an explanation or clarification.

See Explanation Below

Explanation:

struct Money

{

int dollars,cents;

};

int x,y;

cin>>x>>y;

sales.dollars= x;

sales.cents= y;

The code segment is written in C++ programming language

On Line 1 of the code segment;

The struct keyword is used in c++ and other c type programming to define structure. The name of the structure is Money.

It defines a data type such that the data type is a collection of system and user defined data types

The Money structure defines two integer variables; dollars and cents on line 3.

On line 6, two integer variables x and y are declared.

On line 7, the two variables received inputs from the user.

On line 8, the value of variable x is assigned to dollar

On line 9, the value of variable x is assigned to cent

8 0
3 years ago
Read 2 more answers
The contrast ratio of blue 80 text on a yellow-10 background is __ to 1.
Natalija [7]

Answer:

The Answer is 8...

Explanation:

8 0
3 years ago
PLS ANSWER QUICK!!!!
anyanavicka [17]
Photography has given common people the ability to be remembered. Photography democratized making images. Making and distributing images became easier, faster, and less expensive. The details were introduced to the world in 1839, a date generally accepted as the birth year of practical photography.
6 0
3 years ago
Other questions:
  • To use an outline for writing a formal business document what should you do after entering your bottom line statement
    10·1 answer
  • What is the 7 X 7 when referring to PowerPoint presentations?
    12·2 answers
  • Create a public non-final class named Streamer. You should implement one class method: filterStrings. It should accept a single
    8·1 answer
  • Match each item with a statement below. a device used in mobile devices to sense the physical position of the device an area whe
    11·1 answer
  • Practice problems on functions. Write C function(s) to carry out the specified tasks. For each problem, also write the suggested
    15·1 answer
  • What is a traditional tool used to align and mark vertical points from top to bottom?
    10·1 answer
  • 6. When working with a file,
    9·1 answer
  • Is the computer a device that calculates and has the independence and initiative for the actions it performs?
    13·1 answer
  • 1. Describe the sequencing of factors influencing health status codes for patients that also have chronic conditions being manag
    6·1 answer
  • Type the correct answer in the box. Spell all words correctly.
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!