Gourmet Pretzels bakes soft pretzels on an assembly line. It currently bakes 800 pretzels each eight-hour shift. If the producti
on is increased to 1,200 pretzels each shift, then productivity will have increased by: Group of answer choices a.33 percent.
b.50 percent.
c.67 percent.
d.25 percent.