Answer:
Step-by-step explanation:
The only one of these possible answers that could be correct is the fourth one:
The product of a constant factor 5 and a 2-term factor x + 2. That '5' in front of (x+2) multiplies (x+2), and so the result is a product.
This is the question:
A
bicycle manufacturing company makes a particular type of bike.
Each
child bike requires 4 hours to build and 4 hours to test.
Each
adult bike requires 6 hours to build and 4 hours to test.
With
the number of workers, the company is able to have up to 120 hours of building
time and
100 hours of testing time for a week.
If
c represents child bikes and a represents adult bikes,
determine
which system of inequality best explains whether the company can build 10 child
bikes and 12 adult bikes in the week
Now you
can state the system of inequalities from the statements
1) First inequality based on the hours availble
to buiding
Each
child bike requires 4 hours, e<span>ach
adult bike requires 6 hours to build and </span>the company is able to have up to 120 hours of building =>
4c + 6a ≤ 120
2) Second inequality based of the hours available to testing.
Each
child bike requires 4 hours to test, each
adult bike 4 hours to test and the company is able to have up 100 hours of testing time for a week =>
4c + 4a ≤ 100
Then the two inequalities are:
4c + 6a ≤ 1204c + 4a ≤ 100<span>
The answer is Yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100Which you can verify by replacing in both equations 10 for c and 12 for a. Look:
1) 4(10) + 6(12) = 40 + 72 = 112 ≤ 1202) 4(10) + 4(12) = 40 + 48 = 88 ≤ 100</span>
Cosine 65 = 12 / x
0.4226183 = 12 / x
x = 12 / 0.4226183
<span>
<span>
<span>
x = 28.39441</span></span></span>
So, I'd say you are correct.
800 + 16x = 720 + 21x. Cancel out the 720 to get 80 + 16x = 21x. Subtract 16x from both sides to get 80 = 5x. Divide by 5 to get 16 = x, or x = 16. 16 hours. The charge is 800 + 16(16), = 720 + 21(16) which = 800 + 256 = 720 + 336 which = 1,056 = 1,056. Hope this helped!
Answer:
38cm3
Step-by-step explanation: