Answer:
2.897
Step-by-step explanation:
Let us find the mean and variance for the sample first.
105 104 110 112
114 106 108 109
Mean = sum/8 = 108.5
Variance = 12
Std dev = sq rt of variance = 3.464
Std error = std dev/ sq rt n
since n =8, we get std error = 1.225
Since sample size is small, df =8-1 =7
For 95% confidence intervals, t critical value for two tailed=2.365
Margin of error = std error x t critical = 1.225(2.365)
=2.897
$214.60-15=199.60
199.60/20= 9.98
Each cd was $9.98
Answer:
Continuous
Step-by-step explanation:
The rate of flow of water down the river is referred to as its speed. Thus the speed changes with respect to the distance covered. Which implies that there is a direct relationship between the distance covered (in miles) by the water flow and time taken (in hours).
The relationship between hours and miles the water traveled is continuous.
A) I=PRT
I=3000(.12)(2)
I=$720
Answer:
B 8.5 Pounds
Step-by-step explanation:
I hope this helps!