we know that Bob can do the whole job in 14 hours, how much of the work has he done in 1 hour only? well since he can do the whole lot in 14 hours in 1 hour he has only done 1/14 th of the job.
we know that James can do it in 18 hours, a bit slower, so in 1 hour he has done only 1/18 th of the job.
let's say it takes both of them working together say "t" hours, so in 1 hour Bob has done (1/14) of the work whilst James has done (1/18) of the work, the whole work being t/t or 1 whole, so for just one hour that'd 1/t done by both Bob and James.
Using the product rule, we have
so that
The equation of the tangent line to <em>W(x)</em> at <em>x</em> = 7 has all the information we need to determine <em>m'</em> (7).
When <em>x</em> = 7, the tangent line intersects with the graph of <em>W(x)</em>, and
<em>y</em> = 4.5 + 2 (7 - 7) ==> <em>y</em> = 4.5
means that this intersection occurs at the point (7, 4.5), and this in turn means <em>W</em> (7) = 4.5.
The slope of this tangent line is 2, so <em>W'</em> (7) = 2.
Then
Answer:
Answer Is (Answer) Trust me 100% sure.️Hit that report button Too:)
Step-by-step explanation:
Answer: a's value is (6,8) B is (-3,7), and C is (-7,-2)
It would be 2m because each ticket is 2 dollars and then you have to multiply it by the number of tickets you are buying M