Answer: f(x)= -x
Step-by-step explanation:
-x is a reflection of x and I used my graphing calculator and it checks out
Plan b because 18×1 (height×number of weeks) is 18. 18×2 is eyes and 18×3 is 54
Answer:
Step-by-step explanation:
(2 - 0)/(0 + 2)= 2/2= 1
y - 0 = x + 2
y = x + 2
Answer:
ST 45
Step-by-step explanation:
9x=4x+25
5x=25
x= 5
plug back in 9(5)
Answer:
Therefore, the mean and the standard deviation for the number of electrical outages (respectively) are 0.26 and 0.5765 respectively.
Step-by-step explanation:
Given the probability distribution table below:

(a)Mean
Expected Value, 
=(0*0.8)+(1*0.15)+(2*0.04)+(3*0.01)
=0+0.15+0.08+0.03
Mean=0.26
(b)Standard Deviation

Standard Deviation 

Therefore, the mean and the standard deviation for the number of electrical outages (respectively) are 0.26 and 0.5765 respectively.