The answer is 25 % hope it helps
Answer:
<em>Answer: D. Jake paid his loan in 12 months</em>
Step-by-step explanation:
Jake took out an interest-free loan of $2,401.56 from the bank to buy a car.
Since he has to pay no interest for the loan, the monthly payments are totally used to cover the amount of the loan.
He paid the bank $200.13 each month, thus the total months needed to pay the loan is:

Answer: D. Jake paid his loan in 12 months
Answer:
So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
Answer:
If X=2 then the equation would be solved starting with 8x2=16 then take 16 and subtract it by 7 which would equal 9, then you take 9 and add 5 to it and that would give you the answer of 14
Step-by-step explanation:
(8x-7)+5 x=2
(8x2-7)+5
(16-7)+5
9+5
<u>Answer 14</u>
I hope this helps you