Answer:
The most likely cause of a double precipitin ring in a RID test is when there is an antigen-antibody reaction ratio within the equivalence zone. The precipitin line forms when the antigen (with one or more epitopes) and antibody are in optimal proportions to each other and form an insoluble precipitates.
Answer:
kjeo;fwigyds79ay08u-9[onpuefi2 ugw]yw=i\-o3ef
pw]oe;iLH[U
I\EF]
';/ilewuf[p';w iflkh;pif;oewu hf;wfyw hfu we
Explanation:
Based on the information provided, the technician who is correct is: C. Both Technician A and Technician B.
<h3>What is an open circuit?</h3>
An open circuit can be defined as a type of electric circuit in which the continuity between the conducting wire (paths) has been broken or cut.
This ultimately implies that, an open circuit is designed and developed to prevent the flow of electric charges (electrons or currents) from one point in an electric circuit to another.
In Electrical engineering, a short usually causes an electric circuit protection device such as a fuse, circuit breaker, etc., to open when higher than normal current flows through the electrical circuit.
Read more on short circuit here: brainly.com/question/25018411
#SPJ1
Complete Question:
Technician A says a shorted circuit can generate excessive heat. Technician B says a shorted circuit will cause the circuit protection device to open. who is correct?
A. Technician A only
B. Technician B only
C. Both Technician A and B
D. Neither Technician A nor B