Answer:
12. The second one
13. The first one
14. The last one
15. The first one
16. 30 degrees
Step-by-step explanation:
He hold account for 5 years or 5 months. Depending on 3% per year or 3% per month
Answer:
hey:)
the answer is -8.11
there is no step-by-step explanation, because you have to either do it with a calculator or do it by yourself
Answer:
I think the answer is {10,20,30} but please check it
Answer:
The cost per print expressed as a slope is 7.125
Step-by-step explanation:
To calculate the cost per print, let’s envision that we have a graphical representation of cost of posters against the number of posters
We have the cost on the y-axis and the number of posters on the x axis
With the information given in the question, we shall be having two data points
Point 1 = (32,126)
point 2 = (48,240)
Now to find the slope of the line which is cost per print, we make use of both points in the slope equation.
Mathematically, slope m will be
m = y2-y1/x2-x1
Thus, we have;
m = (240-126)/(48-32)
m = 114/16
m = 7.125
The cost per print expressed as a slope is 7.125