1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Novosadov [1.4K]
3 years ago
8

The coefficient of 9(14)P is _____. 9 14 126

Mathematics
2 answers:
bezimeni [28]3 years ago
8 0
The coefficient is 126 because 9 times 14 is 126 
disa [49]3 years ago
6 0

I believe the correct answer to this question is 126. I apologize in advance if the answer I provided is incorrect. -Copelynn.

You might be interested in
Which equation is related equation to 6d = 108 that isolates the variable
ivann1987 [24]
<span>6d = 108

You would first divide each side by 6 to isolate the variable. 
6d = 108
 6       6
d = 18

-Gives you thumbs up- </span>
7 0
3 years ago
Read 2 more answers
Need help with two of these! Thank you
astraxan [27]

Step-by-step explanation:

17) 3x+5-12+4x+2x

3x+4x+2x +5-12

8x-7

if x =6

8*6-7 =48-7

= 41

18.) 9(3x-4y+8)

27x-36y+72

6 0
2 years ago
An American football field is 20 yards longer than a soccer field. An American football field is 120 yards long. How long is a s
Anni [7]

Answer:

A soccer field is 100 Yards.

Step-by-step explanation:

120-100=100yds.

5 0
3 years ago
The outlier, 78, is removed from the data set shown.
bixtya [17]

Answer:

Well, in order o figure this out, you have to understand the definition or range.

Range is the difference between the lowest and highest values.

Since 78 use to be the highest number, the range was 55

Now when we remove the outlier, the new highest value is 45, decreasing the range to 22.

Hope this helps!

4 0
3 years ago
A sludge pool is filled by two inlet pipes. One pipe can fill the pool in 10 days and the other pipe can fill it in 25 days. How
skad [1K]

9.28 days are taken to completely fill the pool

It is given that one pipe can fill the pool in 10 days

the other pipe can fill it in 25 days.

if no sewage is added, waste removal will empty the pool in 31 days.

The amount filled by pipe one in 1 day=1/10

The amount of pool filled by second pipe in 1 day=1/25

The waste removal pipe's work in 1 day= 1/31

Therefore, the work done together by all pipes in one day=1/10+1/25-1/31

= (775+310-250)/31*25*10=835/7750

Therefore, number of days taken to empty the pool= 7750/835=9.28 days

As half day cannot be counted, hence 9.28 days are taken to completely fill the pool

Disclaimer: The waste removal pipe has also been taken into consideration

For further reference:

brainly.com/question/13736913?referrer=searchResults

#SPJ9

5 0
1 year ago
Read 2 more answers
Other questions:
  • Write 5,370 expanded form
    15·1 answer
  • 60 points
    7·1 answer
  • Which of the following is equivalent to
    15·1 answer
  • The perimeter of rhombus is 4√5cm and one of its diagonals is the square of the o<br><br>​
    13·1 answer
  • 6.1 Practice Assignment<br> Find the measure of angle 1?<br> pls help
    9·1 answer
  • Simplify each expression using the order of operations. Then, match the expression (term) on the left with its solution (definit
    15·2 answers
  • Find the volume of a cylinder with a height of 6cm and a radius of 3cm
    10·2 answers
  • What is a quadratic polynomial function with zeros 3 and -3?​
    8·1 answer
  • Plz help ASAP thanks so much
    7·1 answer
  • Can you simpilfy the expression of: 6x-8y-5x+3y<br><br>Answer in comments
    15·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!