Answer:
0.3
Step-by-step explanation:
x is the number to be added to 0.7 to have a sum of 1.



Answer:
The answer is 12.64 ft.
Step-by-step explanation:
From the figure it is clear that slope is the hypotenuse which we have to find while the other two sides are legs of the triangle whose lengths are known.
so the pitch of the roof is 12.64 ft. i explained in the figure below as well.
In a mechanical system, it is a law that energy should be conserved. In this case, what is the initial energy should be equal to the total energy after the motion happened. We do as follows:
PE(at rest) = KE(during motion) + PE(after motion)
51450 J = KE(during motion) + 32781 J
KE(during motion) = 18669 J
Answer:
Average speed = <em>7</em><em> </em><em>metre</em><em> </em><em>per</em><em> </em><em>second</em>
Step-by-step explanation:
Average speed ( v ) = distance / time
=》v = 350 / 50
=》v = 7
so, average speed = 7 m / sec