1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Brut [27]
3 years ago
11

Cost of 6 kg sweets was 250 dollars. The price goes up such that the price of 4 kg is now 250 dollars. Find the % increase.

Mathematics
2 answers:
AURORKA [14]3 years ago
7 0

\frac{2}{6}  \times 250 \\  = 83.3\%

melomori [17]3 years ago
7 0
Its answer is 83.3%
I think it true
You might be interested in
In the isosceles trapezoid, m∠S=68∘ .<br><br> What is m∠Q ?
zmey [24]

9514 1404 393

Answer:

  112°

Step-by-step explanation:

Same-side angles of a trapezoid are supplementary.

  m∠P = 180° - m∠S = 180° -68° = 112°

The angles of an isosceles trapezoid match their symmetrical counterparts.

  m∠Q = m∠P

  m∠Q = 112°

5 0
3 years ago
Question 20 (5 points)
Monica [59]
Well A seems like the most correct answer, the actual purpose of an afterburner is to inject fuel directly into the exhaust stream to increase thrust by as much as 50%. It’s usually used to go supersonic
4 0
3 years ago
A scalene triangle is a right triangle
Katyanochek1 [597]
Yes it can be. There are more than just right triangles but all right triangles are scalene
6 0
3 years ago
What is the answer for <br>3x÷2=6​
8090 [49]

Answer:

x = 4

Step-by-step explanation:

3x÷2=6

Multiply both sides by 2.

3x = 12

Divide by 3.

x = 4

4 0
3 years ago
Read 2 more answers
Create a word problem on Algebraic Expressions and Measurement (grade 10)​
mrs_skeptik [129]

Frank can build a fence in twice the time it would take Sandy. Working together, they can build it in 7 hours. How long will it take each of them to do it alone?

Answer

If Frank and Sandy can build the fence in 7 hours, they must be building

1

7

of the fence every hour.

Now, let the amount of time it takes Sandy be

x

hours so that Frank takes

2

x

hours. Sandy can build

1

x

of the fence every hour and Frank can build

1

2

x

of the fence every hour.

We now have the following equation to solve.

1

x

+

1

2

x

=

1

7

2

+

1

2

x

=

1

7

21

=

2

x

x

=

21

2

=

10.50

Thus, Sandy takes

10.50

hours and Frank takes

21

hours.

6 0
3 years ago
Other questions:
  • A cylindrical cardboard mailing tube has a diameter of 5 in. and a height of 30 in. A total of 30% of the tube’s capacity is fil
    8·1 answer
  • What is 1 2/3 in improper fraction
    15·2 answers
  • A parabola passes through the points (-3,0), (-2,3), and (-1,4). What function does it represent? Use the graphing tool to deter
    7·1 answer
  • At an amusement park, the cost of 3 adult tickets and 4 children’s tickets is $126.50. Another customer paid $120.50 for 2 adult
    5·1 answer
  • What is the Value of X?<br> 8<br> 10<br> 13<br> 20
    5·2 answers
  • You're making dessert, but your recipe needs adjustment. Your sugar cookie recipe makes 4 dozen cookies, but you need 1 dozen co
    14·1 answer
  • Is the following correct? explain. 296 ÷ 6= 48 r8
    8·1 answer
  • The Height of a ramp is 11 inches and the length of its slanted side it 61 inches. What is the length of the base of the ramp?
    8·1 answer
  • Which expression is equivalent to (9⋅5)2/3
    15·2 answers
  • Find the factored form of the expression. Use radicals or i as needed. 6x^2+150=0
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!