The first thing any good mathematician does is convert the measurements to the same unit as what the question is asking. In this problem, it states that the pool fills at a rate of 20 cubic meters per hour. Just keep in mind that an hour is 60 minutes.
The next step is to see how many cubic meters will cost $300. This can be done by dividing 300 by 10. This gets you 30 cubic meters of water.
You already know that 60 minutes is 20 cubic meters of water. That leaves the remaining 10 cubic meters of water. By dividing the rate given, you get that 30 minutes is 10 cubic meters of water. Add the 60 and 30 together to get 90 minutes.
It will take 90 minutes for the pump to use $300.
Answer:
A) A = 1; B = 0; C = 20
Step-by-step explanation:
The standard form for a quadratic is
Ax^2 +Bx +C=0
We are given
1/4x^2 + 5 = 0
Rewriting
1/4x^2 +0x+ 5 = 0
A = 1/4 B=0 C=5
We can multiply each side by 4
4(1/4x^2 +0x+ 5) = 0*4
x^2 +0x+ 20 = 0
A = 1 B=0 C=20
Answer:
x = 21/8
Step-by-step explanation:
So 8 is being multiplied by something to get to 21
So 8x = 21
Solve for x:
-Chetan k
Answer:
<u>Given</u>: base = 10.4ft, height = 12.5
Area of octagon = 8(1/2 × b × h)
- 8(1/2 × 10.4 × 12.5)
- 520ft²
Volume of pool = 520ft² × 3ft
Now, 1 cubic ft takes 7.5 gallons to fill.
Therefore, 1560 cubic ft takes,
So, <u>Correct choice</u> - [D] 11,700.
we have
<u>The system of equations</u>
-------> equation 
-------> equation 
Substitute equation
in equation 

subtract
both sides


Divide by
both sides

the solution is the point 
therefore
the answer is
the solution to the system of equations is the point 