Answer:
The probability that the center will have enough employees to handle this call volume is 0.2764
Step-by-step explanation:
Probability is defined as the ratio of favorable outcomes to the total number of outcomes.
Here the total mean expected number of outcomes=u = 4000
The favorable expected outcomes are = x= 22* 178= 3916
The standard deviation= σ= 5
The random variable X =178 has normal distribution with mean 4000/22 and standard deviation 5
So z= x-u/σ
Z= (3916-4000)/22/5
z= -0.764
From the table of areas under normal curve
P ( x= 3916)= P( -0.764 ≤ Z≤ 0)
P ( x= 3916)= 0.2764
The probability that the center will have enough employees to handle this call volume is 0.2764
In the first step when the student did -2x-3 they didn’t make the sign positive. It should be 4=-2+6, not 4=-2-6
Take the coordinates on each line and find their related slopes:
Slope formula m= (y₂-y₁)/(x₂-x₁)
1st . The two given coordinates of the LOWER line are: (-1,-1) and (1,-2)
them m = (-2+1)/1+1) = -2/2 = -1
2nd. The two given coordinates of the HIGHER line are: (-1,2) and (1,1)
them m = (1-2)/(1+1) = -1/2
3rd. The two given coordinates of the SECANTE are: (1,0) and (2,2)
them m = (2-0)/(2-1) = 2/1 = 1
We notice that the 1st line has m = -1 and the 3rd (secant), m = 1, then only the 1st line and the secant are perpendicular because the product of their slope is equal - 1 (this is the condition to have perpendicular lines)
Answer:
we may do perfect concreate do this stairs
Answer:
mean: 68.95 (69 rounded up)
median: 69.5
range: 11
Step-by-step explanation: