Let x be the first of those three integers. Then we know that x+2 and x+4 are the next two consecutive integers. So our first integer is 20, and the next two are 22 and 24.May 27, 2015
ANSWER
C. 35 men
EXPLANATION
Let m represent the number of men needed and d represent the number of days.
From the question,the number of men needed varies inversely to the time needed to complete the project.
We can write the inverse variation equation.

where k is the constant of variation.
When m=28, d =90.
We substitute these values into the variation equation to determine the value of k.



Now the equation becomes:

When d=72,


Therefore he needs to have 35 men working.
The correct answer is B.3,072. The method is quite simple all you need to do is add the previous number to itself in order to get the next term e.g 3+3=6.............24+24= 48 until the eleventh term.
Hope this helps ya
divide 8 into 3
0.375
8 | 3.000
2 4
-----
60
56
----
40
40
----
0
0.375 is a decimal
times it by 100 to get percent = 37.5 %
(when you times decimals by 100 you simply move the decimal over two places right)
Average rate = distance / time
distance = average rate x time
Range of distance = 2.2(1) to 2.2(3) = 2.2 to 6.6
Required range is all real numbers from 2.2 to 6.6, inclusive.