2.75 hours.
The equation would be 32x + 46 = 134. So we subtract 46 from 134 and get 88. Now we have to divide that by 32 to get the total of 2.75 hours
We put cubic feet of water used on the x-axis and the cost on the y-axis.
The graph will start at (0 , 12.7) because this is the fees before using any water.
The slope of the graph from 0 < x < 300 will be $0.039/cubic ft, and this interval will start at (0 , 12.7) and end at (300 , 24.4).
The slope of the graph for x > 300 will be $0.052/cubic ft, and this interval will start at (300 , 24.4) and continue to x value infinity.
220 units lies within the interval 0 < x < 300 so we use the first slope.
y = 0.039(220) + 12.57
= $21.15
We break 675 cubic feet into two parts, 300 + 375 cubic feet as they will be charged differently.
The cost of the first 300 cubic feet = $24.40
The cost of the remaining 375 cubic feet = 0.052 x 375 = $19.50
Total cost of 675 cubic feet = $43.90
Your answer will be negative 96
Answer:
A) 0
Step-by-step explanation:
Given that

Divisor = 6 = 3*2

As it can be see that x ≥ 75 and Q is product of three consecutive terms (x-1), x, (x+1) which is always completely divisible by 2, 3 and 6. So remainder is zero
I believe the answer would be 65 because 4 squared is 16 and 7 squared is 49 add those and it equals 65