Answer:
yes
Step-by-step explanation:
The figures on the top left and the bottom right have rotational symmetry.
Answer:
I came up with -12
Step-by-step explanation:
8 workers = 6 days to complete
x workers = 4 days faster to complete
6/4=1.5 days faster
1.5 x 8 = 12 workers needed to complete the wall in fours days
Answer:
Total overripe fruit = 48
Step-by-step explanation:
<em>Step 1: Assume the value of oranges</em>
Let oranges be x
Oranges = x
Apples = 32 + x
Overripe oranges = 3/5 of oranges
= 3x/5
Overripe apples = 1/3 of apples
= 1/3 (32 + x)
<em>Step 2: Find x (oranges)</em>
<em>Number of overripe apples and number or overripe oranges are equal.</em>
3x/5 = 1/3 (32 + x)
3 (3x) = 5(32 + x)
9x = 160 + 5x
4x = 160
x = 40
<em>Step 3: Find the total number of overripe fruit.</em>
Total overripe fruit = Overripe apples + Overripe oranges
Total overripe fruit = 1/3 (32 + x) + 3x/5
Total overripe fruit = 1/3 (32 + 40) + 3(40)/5
Total overripe fruit = 24 + 24
Total overripe fruit = 48
!!
Well not all lines are lines of symmerty, because if you draw a let's say a rectangle on a piece of paper and draw a diagonal line through it, well the two sides don't really lie perfectly on one another!!