Answer:
Moore’s law states that processor speeds, or overall processing power for computers will double every two years.
Explanation:
- Moore’s law is more than an observation than a law which was originated in 1970. The observation is about the number of transistors that is present in any system or an integrated system that will be doubled every couple of years.
- The real-world application of Moore's law can be seen during computing your business taxes, piloting a spaceship, or changing the television station, etc.
Answer:
Open ended investigation
Explanation:
The above is an example of an open ended investigation. In understanding what an open ended investigation is, we first of all need to understand what open endedness means. Open endedness means whether one solution or answer is possible. In other words it means that there may be various ways and alternatives to solve or answer a question or bring solution to an investigation.
From the definition, we can deduce that an open ended investigation is a practical investigation that requires students to utilize procedural and substantive skills in arriving at conclusion through evidence gathered from open ended research or experiment(as in not close ended, not limited to ready made options, freedom to explore all possibilities). This is seen in the example question where students are asked to explore the different examples of physical controls and displays and also discuss their observations. Here students are not required to produce a predefined answer but are free to proffer their own solutions
Answer:
recognizing that gender differences are a myth.
Explanation:
The options are:
- active listening.
- recognizing that gender differences are a myth.
- structured debate.
- building cross-cultural understanding
Without active listening, structured debate, and cross-cultural understanding group conflict are definitely on the card. However, no one now is concerned about gender differences. As now both the genders are already having the equal status in at least developed countries. However, this too can play a role in avoiding group conflict. However, since this is not that important considering the current context, this looks like being the correct option here. Hence, the above mentioned in the answer section is the correct option.
Answer:
The team did not adequately formalize the software's design
Explanation:
The most logical reason for this confusion is the fact that the team did not adequately formalize the the software design.
The design approach has to do with clearly defining the architectural modules of the application. The requirements in the software requirement specification document would serve as input for the next phase. The documents are prepared and they give a definition of the overall system architecture.
The team got confused because they did not go through this phase of the 10-phase SDLC model.