Answer:
Please check the attachment.
Explanation:
avg turnaround time = (38+7+42+33+18)/5= 27.6
avg waiting timee = (33+5+28+23+17)/5= 21.2
And its D, A C in Gantt chart at last and exit time are 33, 38 and 42 mentioned as last three in Gantt chart.
Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.
Answer:
Check the explanation
Explanation:
223.1.17/24 indicates that out of 32-bits of IP address 24 bits have been assigned as subnet part and 8 bits for host id.
The binary representation of 223.1.17 is 11011111 00000001 00010001 00000000
Given that, subnet 1 has 63 interfaces. To represent 63 interfaces, we need 6 bits (64 = 26)
So its addresses can be from 223.1.17.0/26 to 223.1.17.62/26
Subnet 2 has 95 interfaces. 95 interfaces can be accommodated using 7 bits up to 127 host addresses can represented using 7 bits (127 = 27)
and hence, the addresses may be from 223.1.17.63/25 to 223.1.17.157/25
Subnet 3 has 16 interfaces. 4 bits are needed for 16 interfaces (16 = 24)
So the network addresses may range from 223.1.17.158/28 to 223.1.17.173/28
Answer:
false
Explanation:
i believe the right term is error
Paper size is how big or small the paper is whilst paper margin is the staight lines or shapes at the sides of a page or sheet.