Answer:
planning charts used to schedule resources and allocate time is the correct answer
Explanation:
- Gantt Charts are a project planning tool used to track the projects from the start to endpoint.
- Gantt charts are used for the preparation and planning of the projects.
- By using Gantt charts we can assess how much time a project would take to complete and we can also determine resources required with the help of Gantt charts.
Answer:
The value is 
Explanation:
From the question we are told that
The height is h = 2.0 m
The height of the window is 
The initial velocity of the rock is 
The angle at which it is thrown is 
Generally the vertical component of the velocity of the stone is mathematically represented as

=>
Generally the height of the window from the ground is mathematically represented as using kinematic equation as

=> 
Here g is negative -9.8 m/s^2 because the direction of the stone is against gravity
So

Solving this quadratic equation using quadratic formula we obtain
t = 0.770 s
Generally the velocity of the stone on the x axis is mathematically represented as

=> 
Generally the distance between the person throwing the rock and the window is mathematically represented as

=> 
=> 
Selection D makes most sense
The cycle of life because the tree starts to grow back in that spot.
Answer:
humen body temperature 98.6f 37c 310.15k
room temperature 68f 20 to 22c 293k
frezing poknt of water tempreture 32f 0c 273.2 K