Answer:
The image is not loading!!
Step-by-step explanation:
Re-upload the question so maybe I can see it.
<span>17 x X = A, i think.</span>
Answer:
2 miles per day
Step-by-step explanation:
The length of the road built is 1/3 miles, so let's call L = 1/3
The time spent to build this length is 1/6 days, so let's call D = 1/6
To find the unit rate in miles per day, that is, the speed that this length of the road was built, we just need to divide L by D (speed is distance over time). Let's call the speed S:
S = D/T
S = (1/3) / (1/6)
S = (1/3) * 6
S = 2 miles per day
Answer:
x= 90/4*2x
Step-by-step explanation:
Answer:
the value of "b" is 8.9 so b=8.9