Answer:
function
Step-by-step explanation:
The graph shows a function since it passes the vertical line test.
Answer:
a. 95.4
b. UCL = 96.07
LCL = 94.73
c. Process is in control
Step-by-step explanation:
a. The computation of estimate mean is shown below:-

= 95.4
b. The computation of Upper Control Limit (UCL) and the Lower Control Limit (LCL) for the manufacturing process is shown below:-


= 95.4 + 0.67082
= 96.07


= 95.4 - 0.67082
= 94.73
c. The explanation is shown below:-
From the above calculation we can see that the sample lies between LCL AND UCL that is (94.73 ,96.07) ,
The Process is in control
Answer:
i think $54.5
Step-by-step explanation:
i did 5 times 40 and 5 times .9
Answer:
-5/3
Step-by-step explanation:
-8--3=-5
5-2=3
Step-by-step explanation:
to find the area of a circle, it is pi times radius squared. so 1 times pi squared is pi^2 the area is 4 plus 2pi^2