Answer:contrast
Explanation:
To make sure it’s easier to read
Answer: A) systems analysis phase of the SDLC.
Explanation:
In accordance with system development life cycle(SDLC) , analysis phase is the stage where all the requirement and materials for the system are collected and ordered.The requirements are in the form of input and output which are extracted and documented to provide clear vision of outcome.
- Other options are incorrect because design phase is for designing the format ans structure of system through input components. Planning and selection stage is making scheme through opting correct requirement for system.
- Implementation and operation phase is the stage of implementing the components on system structure to make them perform their respective tasks. Logic modelling level is defining inputs , components, outputs in logical manner so that they provide desired result operating.
- Thus, the correct operation is option(A).
Answer:
5 time
Explanation:
because I am in school tell study
Answer:
Teredo tunnelling
Explanation:
The tunnelling method that will fit best in the situation is teredo tunnelling. The reason are embedded in its characteristics, they include;
Teredo tunneling has the following characteristics: Its tunnel endpoints are configured on hosts. The hosts are dual stack hosts and perform tunneling of ipv6 to send on the ipv4 network works through NAT the only solution that allows ipv4-only hosts to communicate with ipv6-only hosts is NAT-PT.