Answer:
6 hours
Step-by-step explanation:
20(for babysitting)*6=120
120+5 (for gas)=125
$125=6 hours of babysitting
Answer:
The mean is 9.65 ohms and the standard deviation is 0.2742 ohms.
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
10% of all resistors having a resistance exceeding 10.634 ohms
This means that when X = 10.634, Z has a pvalue of 1-0.1 = 0.9. So when X = 10.634, Z = 1.28.




5% having a resistance smaller than 9.7565 ohms.
This means that when X = 9.7565, Z has a pvalue of 0.05. So when X = 9.7565, Z = -1.96.




We also have that:

So





The mean is

The mean is 9.65 ohms and the standard deviation is 0.2742 ohms.
You can just use a calculator but when you add the numbers all together you get 323
We can find the slope of this line by using the slope formula:

We'll use the points (-6, 0) and (0, -3)
(-3 - 0) / (0 + 6) = -3/6 = -0.5
The slope of the line is A, -1/2
First you need to divide 64 by 75 and then multiply by 100 which is 85.3% which then you need to find the average of the 2 which will be (85.3+x)/2=88 where x= the value of the second test.
Then you will need to isolate the x with the following steps:
- multiply each side by 2 making it 85.3+x=176
- Subtract 85.3 from each side
- this results in 90.7