1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
marishachu [46]
3 years ago
11

How does a Graphical User Interface (GUI) interact with a desktop or laptop computer?

Computers and Technology
1 answer:
Viefleur [7K]3 years ago
4 0

Windows, icons, menus, and pointers does  a  graphical  user interface (GUI) interact with a  desktop or laptop computer.

  • Windows, icons, menus, and pointers

<u>Explanation:</u>

Graphics user interface (gui) made a big resolution on desktop or laptop or tablet or workstation industries. In olden days till  1994 still, people were using the black and white computer where a desktop consists of keyboard and printer and monitors where display color white and black.

If we open a picture it will display only in black and white so games are in black and white mode. After windows  3.1  we have seen color picture and mouse interface is used. Since technology developed and interface in GUI is also developed improved in windows icon menu and mouse pointer.

As technology developed we going back to a dark mode such as black and white mode.

You might be interested in
Computer networks make setting appointments easier by _____.
Sunny_sXe [5.5K]

Probably providing a common calendar

5 0
3 years ago
Read 2 more answers
How do u friend people
Verdich [7]
You click on the three dots and click the person silhouette with the plus sign on it.
4 0
3 years ago
Read 2 more answers
For an activity with more than one immediate predecessor activity, which of the following is used to compute its earliest finish
laila [671]

Answer:

The correct option is A

Explanation:

In project management, earliest finish time for activity A refers to the earliest start time for succeeding activities such as B and C to start.

Assume that activities A and B comes before C, the earliest finish time for C can be arrived at by computing the earliest start-finish (critical path) of the activity with the largest EF.

That is, if two activities (A and B) come before activity C, one can estimate how long it's going to take to complete activity C if ones knows how long activity B will take (being the activity with the largest earliest finish time).

Cheers!

7 0
3 years ago
What is the maximum length of a text field can be?<br>​
Luda [366]

Answer:

4000 characters

Explanation:

I think the max is 4000 characters

7 0
1 year ago
Read 2 more answers
I gift points!!!!!! Come on!!!!!!!
pogonyaev

Answer:yesss

Explanation:

3 0
3 years ago
Read 2 more answers
Other questions:
  • Which of the following is a goal of paraphrasing and summarizing?
    14·2 answers
  • This type of connection uses radio waves to connect devices on a network.
    15·2 answers
  • A text-only forum accessed through a bulletin board service (BBS) is known as a _____.
    14·1 answer
  • To what extent can u justify that computer is not the only ICT tool?​
    9·1 answer
  • A virtual meeting is the same thing as a/an A. online meeting. B. VoIP. C. seminar. D. convention.
    12·1 answer
  • (d) What other services beside cloud-based software may be provided by Internet hosts?[1]
    11·1 answer
  • What is a function of Agile software development?<br>​
    7·1 answer
  • In the program below, which two variables have the same scope?
    9·2 answers
  • A program that converts a program to binary all at once and runs the entire program when finished with the conversion.
    5·1 answer
  • A program that performs handy tasks, such as computer management functions or diagnostics is often called a/an ____________.
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!