Answer:
Using a one time password OTP and using a three factor authentication.
Explanation:
Social engineering is a form system and network attack, drafted by an attacker, to steal user credentials needed for accessing their accounts, to steal information.
Social engineering attacks like phishing, spear phishing, baiting and quid quo pro are used to fool users to giving out their user details.
One time password is an implied use of a password just once and a new password his generated to boost security. In a three factor authentication, OTP can be used as well as biometrics of a user which can not be giving away by a user to an attacker.
Answer: Time division multiplexing
Explanation: because a slot is equivalent to 125ms
And each position inside a slot is for each signal and a single bit frim each voice conversation is sent during each 125ms slot
The answer is b becuase a daily blog is a daily journal
Hi! Did you forget to add something to this?
Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.