Answer:3.9
Step-by-step explanation:
Answer:
11+3z
Step-by-step explanation:
You would combine the like terms, 9+4-2 is 11 and 6z-3z=3z
Answer:
256
Step-by-step explanation:
4^4^4 = 4^(4^4) = 4^256
so written in base 4, there will be 256 zeroes after a 1.
This translates to approximately 154 digits in decimal.
Just like 2^2^2 = 2^4
there will be four zeroes after a 1.
2^2^2=2^(2^2) = 2^4 = 16 = 10000 (16 in base 2).
Answer:
12m
Step-by-step explanation:
work out the area of the rectangle then times it by 2 because the parallelogram is twice the area of the rectangle. 8 × 4.5m = 36m². 36 ×2 = 72cm². Now you do 72 ÷ 6 = 12 . the answer is 12m.
This question is incomplete
Complete Question
Consider greenhouse A with floor dimensions w = 16 feet , l = 18 feet.
A concrete slab 4 inches deep will be poured for the floor of greenhouse A. How many cubic feet of concrete are needed for the floor?
Answer:
96 cubic feet
Step-by-step explanation:
The volume of the floor of the green house = Length × Width × Height
We convert the dimensions in feet to inches
1 foot = 12 inches
For width
1 foot = 12 inches
16 feet = x
Cross Multiply
x = 16 × 12 inches
x = 192 inches
For length
1 foot = 12 inches
18 feet = x
Cross Multiply
x = 18 × 12 inches
x = 216 inches
The height or depth = 4 inches deep
Hence,
Volume = 192 inches × 216 inches × 4 inches
= 165888 cubic inches
From cubic inches to cubic feet
1 cubic inches = 0.000578704 cubic foot
165888 cubic inches = x
Cross Multiply
x = 16588 × 0.000578704 cubic foot
x = 96 cubic feet
Therefore, 96 cubic feet of concrete is needed for the floor