Answer:



Step-by-step explanation:
From the diagram, quadrilateral BCEF is a cyclic quadrilateral.
Opposite angles if a cyclic quadrilateral sum up to 180°

The diagonals intersect at D to form two pairs of vertical angles, and vertical angles are congruent.

Also sum of angles in triangle CBD is 180°.

Answer:
a. 3/4 inches per minute
b. -1 1/8 inches per minute
c. B is fastest; 1 1/8 is more than 3/4
Step-by-step explanation:
A <em>change</em> is a <em>difference</em>. A <em>rate of change</em> is <em>one difference divided by another</em>, usually the change in y-value divided by the change in x-value.
__
<h3>a.</h3>
The change in elevation is the difference between the elevation at the end of the period (6 inches) and the elevation at the beginning of the period (3 inches). The change in time period is the difference between the end time (8 min) and the beginning time (4 min).
change in elevation per minute = (6 -3 inches)/(8 -4 min)
= (3 inches)/(4 min) = 3/4 inches/minute
__
<h3>b.</h3>
Similarly, ...
change in elevation per minute = (3 -7 1/2 inches)/(18 -14 min)
= (-4 1/2 inches)/(4 min) = -1 1/8 inches/minute
__
<h3>c.</h3>
We know that 3/4 is more than -1 1/8, but when we talk about the "fastest rate of change", we're generally interested in the magnitude--the value without the sign. That means we understand a rate of change of -1 1/8 inches per minute to be "faster" than a rate of change of 3/4 inches per minute.
The rate of change from Part B is fastest. 1 1/8 inches per minute is more than 3/4 inches per minute.
The way we would answer the question would be to express it as
100-9(n-1) with n being the nth term of the pattern.
Why is this? We know we subtract 9 each time and START from 100.
Remember though that 100 is the first term in the sequence. So, we would have (n-1)*9 to subtract 0 from our 1st term and 9 from our second term.
Also, we have 9*(n-1) because we are just subtracting multiples of 9. It is always going to subtract by 9.
If you needed the answer here it is...
The answer to the problem would be
100-9(13-1)
= 100-9(12)
= 100-108
= -8