Answer:
1)- Variable utilities cost per machine hour = 1.6 per machine hour
2)- Fixed cost = 1740
3)-Total cost on 1220 Machine hour will be
= 3692
Step-by-step explanation:
1) CALCULATE VARIABLE UTILITIES COST PER MACHINE HOUR :
Variable utilities cost per machine hour = Change in cost/high machine hour-low machine hour
=4076-3388/1460-1030
Variable utilities cost per machine hour = 1.6 per machine hour
2) Fixed cost = Total cost-variable cost
= 3388-(1030*1.6)
Fixed cost = 1740
3) Total cost on 1220 Machine hour will be (1220*1.6+1740) = 3692
I believe the Answer is : 12/13
Answer:got u fam
Step-by-step explanation:
#1) -318 meters
#2) -8, -6, 3, 5, 7
#3) -4
#4) +8
#5) +5
#6 -15
#7) Oymakon, Winniepeg, Boston, New Delhi, Las vegas
X=3/20 i think. if not so sorry
H(d)=height from water
when he reaches the water, his height from water=0
so set the equation equal to zero and solve
0=-d^2+2d+24
multiply both sides by -1 for ease
0=d^2-2d-24
now find what 2 factors of -24 add up to -2
answer is -6 and 4
0=(d-6)(d+4)
set each to zero
d-6=0
d=6
d+4=0
d=-4
you cannot have negative distance because that means he hasn't jumped yet so get rid of this number
d=6
answer is 6 meters