1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Vladimir79 [104]
4 years ago
7

What is the simplified form of the following expression ? 2x^2y+3x^2+4y+3x^2y+2y

Mathematics
1 answer:
Arlecino [84]4 years ago
8 0
3x^2+6y+5x^2y is the simplified form
You might be interested in
I. find the distance the two given points​
Sunny_sXe [5.5K]

Answer:

Step-by-step explanation:

Use the formula,

distance = √[(x1-x2)^2 + (y1-y2)^2]

3 0
3 years ago
A line passes through the points (3, −1) and (−5, 3) . What is the point-slope form of the line
aleksandrvk [35]
Hello here is a solution:
equation for the line is :   y = ax+b    a : slope
let A(3;-1)   B(-5;3)
a= ((3)-(-1))/(-5)-(3))
a= 4/-8
a=-1/2
y=(-1/2) x+b
- 1 = (-1/2)(3)+b
b= 1/2
the equatdion is : y=(-1/2)x+1/2
8 0
3 years ago
A furniture shop refinishes chairs. Employees use two methods to refinish chairs. Method I takes 0.5 hours and the material cost
sveta [45]

Answer:

With Method I, they should plan to refinish 92 chairs and with Method II they should plan to refinish 70 chairs.

Step-by-step explanation:

This problem can be solved by means of a system of equations, that is to say a system that in this case will contain 2 linear equations with two variables: "x" and "y".

First you must define what your variables x and y are:

  • x: Chairs refinished by method I.
  • y: Chairs refinished by method II.

On the one hand, you know that between method I and method II they plan to work 151 hours. In method I, each chair takes 0.5 hours of work, this means that to obtain the total amount of time it takes to work in the "x" chairs by this method, 0.5 must be multiplied by the number of chairs. You can apply the same reasoning to calculate the total amount of time it takes to work on the "y" chairs by method II knowing that each chair takes 1.5 hours. Everything said above is represented by the equation:

<em>\frac{1}{2} *x+\frac{3}{2} *y=151 Equation (A)</em>

In the equation the values ​​0.5 and 1.5 are represented in the form of a fraction (1/2 and 3/2 respectively) to be able to solve more in a way how the system of equations.

On the other hand, to state the other equation of the system, it must be taken into account that by method I the material costs $ 9 for each chair and by method II the material costs $ 7 for each chair. To determine the value of the material in each method, multiply the value of each chair by the amount of chairs refinished in each case. And the sum of the value of the materials of both methods must be $ 1318. This is represented by the equation:

<em>9*x+7*y=1318 Equation (B)</em>

Having both equations, you can solve the system. There are several methods to solve it, but one of the easiest and most widely used methods is substitution. This consists of isolating one of the variables from one of the equations and replacing it in the other equation.

In this case you can choose to isolate the variable x from equation B, resulting in:

x=\frac{1318}{9} -\frac{7}{9} *y <em>Equation (C)</em>

It is always preferable to work in fractions for convenience to solve the calculations.

Now you replace the expression obtained from x in equation A, obtaining:

\frac{1}{2} *(\frac{1318}{9} -\frac{7}{9} *y)+\frac{3}{2} =151

Now you have an equation with a variable, "y", which can be solved, that is, you can get the value of "y". So "y"=70

Remembering that the variable "y" is the number of chairs refinished by method II, <u><em>the value of "y" means that 70 chairs by that method were refinished</em></u>.

To calculate the value of "x", you simply replace the value of "y" in either of the two equations (A) or (B) of the system and solve the equation. Or you can replace the value of "y" in equation (C): Either way the result must be the same: "x"=92

Remembering that the variable "x" is the number of chairs refinished by method I, <u><em>the value of "x" means that 92 chairs by that method were refinished.</em></u>

6 0
3 years ago
Hey can any one tell me if 5/√5 is rational or irrational
irina1246 [14]

Answer:

Irrational

Step-by-step explanation:

8 0
3 years ago
Read 2 more answers
If f (x) is a one-to-one function and f (8) = -2 then which of the following points
Lerok [7]

Answer:

I think it is -2,8

Step-by-step explanation:

6 0
3 years ago
Other questions:
  • Which of the following options is a better purchase for a microwave? A. $10 down with equal payments of $5 for 24 weeks B. $5 do
    12·1 answer
  • A cylindrical glass is 3 inches in diameter and 6.5 inches tall. How much water can the glass hold when full? Round your answer
    15·1 answer
  • Explain how you would convert a measurement given in ounces into pints.
    8·1 answer
  • Complete the equation of the line through (-9,7) and (-6,-3)
    6·1 answer
  • A metal rod will be cut into pieces that are each 1/56 meters long. The rod is 7/8 meters long. How many pieces will be made fro
    6·1 answer
  • Select the table that represents a linear function. (Graph them if necessary.)
    14·1 answer
  • I need help asap i’ll give brainliest
    15·1 answer
  • At a local health centre two doctors were on duty in the weekend. Dr. Makaila spent 91 minutes to consult 7
    7·1 answer
  • The data set shown below has an outlier. Determine the outlier and then answer the questions as to what happens to the median, m
    10·1 answer
  • RATING BRAINLIEST Which of the following demonstrates the Distributive Property?
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!