1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
charle [14.2K]
3 years ago
6

I NEED HELP WITH THIS ASAP!!! PLZZZ

Social Studies
2 answers:
lisov135 [29]3 years ago
8 0

Answer:

1.Legislative

2.Judicial

3.Legislative

4.Legislative

5.Legislative

6.Judicial

7.Legislative

8.Judicial

9.Executive

10.Legislative

SIZIF [17.4K]3 years ago
6 0

Answer:

I don't know the answers to this but an hour ago I saw someone looking for the answers to exactly this and they had been given them

You might be interested in
during a very difficult test all your classmates will you teacher is out of the class what how will u response in that situation
Yuri [45]

Answer:

Bhartiya loktantra ki jaati mein yah pahla wish you a hai jismein during very difficult test your classmates

6 0
3 years ago
What was the 32 president
Papessa [141]
The 32nd president of United States was Franklin D. Roosevelt.
6 0
3 years ago
Read 2 more answers
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
What are the 3 different types of norms?
IrinaVladis [17]

There are four types of social norms that can help inform people about behavior that is considered acceptable: folkways, mores, taboos, and law. Further, social norms can vary across time, cultures, place, and even sub-group.

8 0
3 years ago
Read 2 more answers
Which structure is only found in animal<br> cells
ehidna [41]

Answer:

Explanation:

8 0
2 years ago
Read 2 more answers
Other questions:
  • Each stage of freud's psychosexual theory of development is characterized by a conflict associated with different parts of the b
    11·2 answers
  • Help please <br> A<br> B<br> C<br> D
    7·2 answers
  • Another name for the Counter-Reformation of the 1500s was the Catholic Reformation. the English Reformation. the German Reformat
    8·2 answers
  • Which statement about ethnic groups and religious groups is correct?
    9·2 answers
  • In 1763, who was the Ottawa Chief who led the fight against frontier settlers?
    13·1 answer
  • NEED MORE HELP ON SOCIAL STUDIES!
    8·1 answer
  • Unlike Bowenians, experiential therapists will _______ then behave in alternatively provocative and supportive ways in order to
    13·1 answer
  • This is a last question can anybody answer this plz
    13·1 answer
  • Compare and contrast between an agricultural society and an industrial society.​
    13·2 answers
  • Please helppp, this is an emergency
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!