1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
loris [4]
3 years ago
15

A company manufacturing oil seals wants to establish X and R control charts on the process. There are 25 preliminary samples of

size 5 on the internal diameter of the seal. The summary data (in mm) are as follows:
sigma^25_i = 1 X_t = 1, 253.75, sigma^25_i = 1 R_i = 14.08
(a) Find the control limits that should be used on the X and R control charts. For n = 5, A2 = 0.577, D4 = 2.114, D3 = 0
(b) Assume that the 25 preliminary samples plot in control on both charts. Estimate the process mean and standard deviation.
Mathematics
1 answer:
alisha [4.7K]3 years ago
6 0

Answer:

A ) i) X control chart : upper limit = 50.475, lower limit = 49.825

    ii) R control chart : upper limit =  1.191, lower limit = 0

Step-by-step explanation:

A) Finding the control limits

grand sample mean = 1253.75 / 25 = 50.15

mean range = 14.08 / 25 = 0.5632

Based on  X control CHART

The upper control limit ( UCL ) =

grand sample mean + A2* mean range ) = 50.15 + 0.577(0.5632) = 50.475

The lower control limit (LCL)=

grand sample mean - A2 *  mean range = 50.15 - 0.577(0.5632) = 49.825

Based on  R control charts

The upper limit = D4 * mean range = 2.114 * 0.5632 = 1.191

The lower control limit = D3 * mean range = 0 * 0.5632 = 0  

B) estimate the process mean and standard deviation

estimated process mean = 50.15 = grand sample mean

standard deviation = mean range / d2  = 0.5632 / 2.326 = 0.2421

note d2 is obtained from control table

You might be interested in
PLEASE ANSWER QUICKLY ASAP <br>please read question carefully ​
puteri [66]

Answer:

340 im pretty sure

Step-by-step explanation:

5 0
3 years ago
The formulas for power and work are and , where P is the power, W is the work done, t is the time, F is the force, and d is the
vladimir2022 [97]
Power= work/time, work/time=(force x displacement)/time

therefore, power= (Fd)/t
4 0
3 years ago
Read 2 more answers
HELP ME PLEASE ASAP IT'S AN EMERGENCY
gizmo_the_mogwai [7]

The answer is b.

This is because the line is sloping downwards, and so y = -1

3 0
3 years ago
What is 275x56 in stander algorithm pls help
leonid [27]
1650
1375
15400
Hope this will be helpful
5 0
3 years ago
Select TWO expressions that
8090 [49]

Answer:

A and D

Step-by-step explanation:

4×3=12

4×d=4d

12+4d

Then;(4×d)+(3×4)=4d +12

Same expression

6 0
2 years ago
Read 2 more answers
Other questions:
  • A cell phone provider offers a plan that costs ​$30 per month plus ​$0.20 per text message sent or received. A comparable plan c
    9·2 answers
  • Find the fifth term of the arithmetic sequence in which
    15·1 answer
  • Sylvia has three gerbils. if two of her gerbils each have six babies every two months, how many babies will the gerbils have alt
    12·1 answer
  • Joan has 287 dollars to spend on 7 books after buying them she had 14 dollars how much did the books cost
    15·1 answer
  • Is y=2x-3 proportional
    9·1 answer
  • Given below is the odd-number function. which of the following are equal to o(7)?
    15·2 answers
  • Which of the following is true about the graphs below?
    9·1 answer
  • If 12x = 108 how much is x?
    8·2 answers
  • Which of the following is true about these similar triangles?
    6·1 answer
  • If the surface area of the cone below is 628.32, find its volume. (Diameter is 16)
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!