Using the normal distribution, it is found that 58.97% of students would be expected to score between 400 and 590.
<h3>Normal Probability Distribution</h3>
The z-score of a measure X of a normally distributed variable with mean
and standard deviation
is given by:

- The z-score measures how many standard deviations the measure is above or below the mean.
- Looking at the z-score table, the p-value associated with this z-score is found, which is the percentile of X.
The mean and the standard deviation are given, respectively, by:

The proportion of students between 400 and 590 is the <u>p-value of Z when X = 590 subtracted by the p-value of Z when X = 400</u>, hence:
X = 590:


Z = 0.76
Z = 0.76 has a p-value of 0.7764.
X = 400:


Z = -0.89
Z = -0.89 has a p-value of 0.1867.
0.7764 - 0.1867 = 0.5897 = 58.97%.
58.97% of students would be expected to score between 400 and 590.
More can be learned about the normal distribution at brainly.com/question/27643290
#SPJ1
Answer:
50 hammers and 20 wrenches.
Step-by-step explanation:
Let x represent number of hammers and y represent number of ranchers.
We have been given that a store sold 70 hammers and ranchers. We can represent this information in an equation as:

We are also told that each hammer sold for $10 and each rancher sold for five dollars resulting a total of 600.00. We can represent this information in an equation as:

From equation (1), we will get:

Substituting this value in equation (2), we will get:






Therefore, 20 wrenches were sold.
Now, we will substitute
in equation (1) as:



Therefore, 50 hammers were sold.
Step-by-step explanation:
tvt67tvyy8vy8vt67vt7v6vt67yvtv
Answer:
The total time the water balloon is in the air is 8 seconds. The balloon reaches the maximum height of 25 fee after 3 seconds. The water balloon has a height of 24 feet at 2 seconds and a half.
Step-by-step explanation: