Answer:
The correct answer is H
Step-by-step explanation:
1/4 of a wall in 2/3 of an hour is 40 min
so a wall takes 160 min which is 2 hours and 40 min
so 3 walls takes 8 hours
Answer:
Z scores between -0.995 and 0.995 bound the middle 68% of the area under the stanrard normal curve
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Middle 68%
Between the 50 - (68/2) = 16th percentile and the 50 + (68/2) = 84th percentile.
16th percentile:
X when Z has a pvalue of 0.16. So X when Z = -0.995
84th percentile:
X when Z has a pvalue of 0.84. So X when Z = 0.995.
Z scores between -0.995 and 0.995 bound the middle 68% of the area under the stanrard normal curve
Well there really wouldn't be a combo since everything is different so I'm saying nun? that's what I'm going with. ( If this is wrong correct me )
Answer:
Step-by-step explanation:
f(9)=5(9-3)(9-2)
=5*6*7
=210
Answer:
$190.4
Step-by-step explanation:
I divided the 71.40 dollars by three to find how much one pair would cost and then multiplied that by 8 to find how much 8 pairs would cost.