Maybe you meant solve for x?
If so, the answer is 4
Answer:
25 – 4.33 = 20.67
7 + (1 - 100) = -92
Step-by-step explanation:
First one) Simply use your knowledge of integers and decimals to solve this. You can even start by drawing a number line and practising with that before beginning to do harder problems.
Second one) Just like the first one but use PEDMAS, BEDMAS or BODMAS and make sure to solve the brackets first.
Answer:
828.7 hours.
Step-by-step explanation:
To answer a question in which the total time has to be calculated of all the activities, first of all, all the times have to be converted to a single form. There are two types: decimals and fractions. Convert the fractions into decimals.
Department A = 202.50 hours.
Department B = 212 3⁄4 hours = 212.75 hours.
Department C = 198.25 hours.
Department D = 215 1⁄5 hours = 215.20 hours.
Therefore, the total number of hours spent on this project by all four departments. is the sum of all the above numbers. 202.50 hours + 212.75 hours + 198.25 hours + 215.20 hours = 828.7 hours.
Therefore, the total time is 828.7 hours!!!
Answer:
see explanation
Step-by-step explanation:
the sum of the lengths of any two sides of a triangle is greater than the length of the third side.
if the sides are a, b, c , then the following must be true
a + b > c
a + c < b
b + c > a
for the 3 sides to form a triangle