I believe you meant "why is the number of shifts multiplied by approximately 4.5 to obtain the total number of operators required to run the plant"
Answer and Explanation:
There are 3 shifts per day, 49 weeks per year and 5 shifts per operator per week
To get total number of operators required to run the plant, we multiply number of shifts in a year by number if operators per shift.
49 weeks×5 shifts= 245 shifts per operator per year
365×3 shifts= 1095 shifts per year
1095/245=4.5 operators per shift
total number of operators required to run the plant(per day) = 4.5×3= 13.5 approximately 14
total number of operators required to run the plant(per year) =4.5×1095=4927.5 approximately 4928
Answer:
quadrant ll
Step-by-step explanation:
A point on the y-axis will always have an x-coordinate of zero. Instructions: In the figure above, the point with coordinates (4,2) is located in quadrant I. The point with coordinates (-3,4) is located in quadrant II.
Answer:
sure
Step-by-step explanation:
she multiplied it 3 times, so, i dont think 8 should be negative.
this is what I got for it lmk if u have any more questions
True, volume is a tree dimensional measure.