Answer:
$4 and $3
Step-by-step explanation:
First, write out the equations as 70x + 29y = 367 and 70x + 45y = 415. Solve by using the elimination method by subtracting 70x from 70x. 45y minus 29y is equal to 16y. 415 minus 367 is 48. Divide 48 by 16, to get y is equal to get y is equal to three. Y represents pepperoni pizzas, so a pepperoni pizza costs $3. Plug a 3 into any equation for y and solve for x. 29 times 3 is 87. 367 minus 87 is 280. 280 divided by 70 is equal to 4, so x is equal to 4.
A scatter plot with a trend line that has a slope of 1/3 shows a positive correlation between the data. Positive correlation indicates that as one set of data increases, the other will also increase. A trend line shows a rough estimate on the relationship between two sets of data. A line with a slope of 1/3 is increasing, so this indicates that the data in the scatter plot are positively correlated.
Answer:
Subtract 3 and one-fifth from both sides of the equation
Step-by-step explanation:
Well to find n you gotta separate it.
3 1/5 + n = 9
-3 1/5
n = 5.8
<em>Thus,</em>
<em>to seperate it you subtract 3 1/5 from both sides.</em>
Hey there!

Firstly, we are going
add 
on each of the sides that we're working with. like ↓

This gives us

(if you are wondering how we got the out come of

it is because I
added 
Now
multiply 
on each of your sides
Cancel the first set and you will find the value of

Good luck on your assignment and enjoy your day ~
Answer:
(a) The expected number of guests until the next one pays by American Express credit card is 4.
(b) The probability that the first guest to use an American Express is within the first 10 to checkout is 0.0215.
Step-by-step explanation:
The random variable <em>X</em> can be defined as the number of guests until the next one pays by American Express credit card
The probability that a guest paying by American Express credit card is, <em>p</em> = 0.20.
The random variable <em>X</em> follows a Geometric distribution since it is defined as the number of trials before the first success.
The probability mass function of <em>X</em> is:

(a)
The expected value of a Geometric distribution is:

Compute the expected number of guests until the next one pays by American Express credit card as follows:



Thus, the expected number of guests until the next one pays by American Express credit card is 4.
(b)
Compute the probability that the first guest to use an American Express is within the first 10 to checkout as follows:


Thus, the probability that the first guest to use an American Express is within the first 10 to checkout is 0.0215.