The throughput time of the system is 35
Explanation:
When we talk of the throughput time of a system, we are referring to the total time utilized from the start of the job to the end
So to calculate the throughput time of this system, we simply need to add all the hours of work together (proceeds time)
That would be; 5 + 9 + 4 + 9 + 8 = 35
Hello!
Here are some tips:
• Get a good night's sleep. Believe me, if I don't get at least 7 hours of sleep before a big test, my mind won't function properly and I'll forget everything I'd practised. So, please, get enough sleep.
• Eat something good before the test. It'll help you. When your belly is full, almost everything is okay! :D Seriously, eat enough so that you wouldn't get hungry during the test, and you'll have less to think about. Also, make sure the food doesn't contain too much sugar.
• Take breaks when you're studying. Do NOT cram all those facts in your head, because they won't stay there. Set up a schedule and designate a specific part of every day to studying, and it shouldn't be longer than half an hour.
• Here's a bonus tip I've learned from past experiences. Please don't use TVs, phones, and anything that will distract you. If you need a calculator, USE A CALCULATOR, and not an online one. Otherwise you won't be as productive and it'll definitely distract you.
Barter means exchange since there was no currency back then so the answer would be D.