1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
nadezda [96]
4 years ago
14

A seagull can dive 45 meters below the surface of the water to reachable fish.it dives 11% of the total depth every 1 second.wha

t is the depth of the seagull after 2 second?
Mathematics
2 answers:
RoseWind [281]4 years ago
8 0
Its 9.9 meters hope this helped :)
defon4 years ago
4 0
1 second = 11%
2 seconds = 22%

45 × .22 = 9.9

answer: 9.9 meters
You might be interested in
Last week 24,000 fans attended a football match. this week three times as many bought tickets, but one-sixth of them cancelled t
lukranit [14]

Answer:

C. 60,000

Step-by-step explanation:

<u>Given</u>

  • 24,000 fans attended a football match
  • three times as many bought tickets
  • one-sixth of them cancelled their tickets

<u>Three times as many bought tickets</u>

24,000 * 3 = 72,000

<u>one-sixth of them cancelled their tickets</u>

72,000 * 1/6 = 12,000

<u>Subtract</u>

72,000 - 12,000 = 60,000

<u>Answer</u>

60,000 people are attending this week

6 0
4 years ago
Algebra expression 5 minus the difference of m and 2?
Reil [10]

Answer:

7-m

Step-by-step explanation:

The difference of m and 2

m-2

5 minus the difference of m-2

5-(m-2)

5-m+2

Collect like terms

7-m

5 0
3 years ago
8. A can do a piece of work in 16 days, B in 10 days. A and B work at it together for 6 days and then C finishes it in 3 days. I
cupoosta [38]

Answer: 120 days

Step-by-step explanation:

A can complete it in 16 days.

=100/16 =6.25%/day.

B has ten days to do it.

10% every day is equal to 100/10.

So they would each contribute 16.25 percent per day as a group.

then for six days,

16.25*6 =97.50percent

97.50% of the work has been finished, in other words.

The amount of work left is now 100-97.5 = 2.5.

C finishes up the remaining job in 3 days

3.5% in 3 days, to be exact.

Consequently, he will finish his entire project in 120 days.

[2.5 * 40 = 100 percent; 40 * 3 = 120 days]

8 0
2 years ago
Type SSS, SAS, ASA, SAA, or HL to<br> describe these triangles.
GalinKa [24]

Answer:

HL

Step-by-step explanation:

3 0
3 years ago
40. Find UW.<br> T<br> 6<br> 5<br> U +-<br> The measure of UW is<br> type your answer...
Ahat [919]

Answer:

9

Step-by-step explanation:

UT^2 = UV * UW

6^2 = (x - 7)(x - 7 + 5)

36 = (x - 7)(x - 2)

36 = x^2 - 2x - 7x + 14

x^2 - 9x - 22 = 0

(x - 11)(x + 2) = 0

x - 11 = 0  or  x + 2 = 0

x = 11

UW = x - 7 + 5

UW = 11 - 7 + 5

UW = 9

7 0
3 years ago
Other questions:
  • A wheel has a radius of 10 cm. Approximately how far does it travel in 3 revolutions?
    9·1 answer
  • I WILL GIVE EXTRA POINTS AND BRAINLIEST HELPPP PLEASE!!!! SHOW ALL WORK!!!<br><br>Solve All 4!!
    5·1 answer
  • Twenty disks with the given measurements are stacked on top of each other. Which expression does NOT give the volume of the cyli
    10·2 answers
  • 38. Express these rates in the lowest terms.
    5·1 answer
  • What is the solution of the equation? Square root 2x+13-5=x
    9·2 answers
  • 3x = 5х + 4<br> Please help mee
    11·1 answer
  • Evaluate the expression w^2 - v + 1 for w = -2 and v = -8<br> a. -3 <br> b. -11<br> c. 13<br> d. 5
    6·2 answers
  • Solve for a 3a+9 = 18 *<br> a = 5<br> a = 10<br> a = 3<br> None of the above
    13·1 answer
  • Pls help meeee and if y’all want give me yalls snap or sum cus I need more help
    7·2 answers
  • Write the slope-intercept equation of the line that passes through the given point and is perpendicular to the given line.
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!