Let's first break it down to the time 8 people need for one wall. That would be 10 minutes, right? If one person would have to do it in stead of 8, you'd expect him to take 80 minutes.
To paint 7 walls, he would nee 7x80 = 560 minutes. 10 people would do that 10 times faster, ie., 56 minutes.
I know puzzles like these always have a mindtrick. Did I miss anything?? ;-)
Answer:
The number lines are shown below.
Step-by-step explanation:
In the given problem the sign of inequality is missing.
We know, that there are 4 signs of inequality ">", "<", "≥" and "≤".
The possible inequalityes are
In
, all points on the right side of 23 are included in the solution set.
In
, all points on the left side of 23 are included in the solution set.
In
, 23 and all points on the right side of 23 are included in the solution set.
In
, 23 all points on the left side of 23 are included in the solution set.
3x + (x+3) = 19
4x + 3 = 19
4x = 16
x = 4
y= x+3
y= 4+3
y= 7