The grade of the path in the mountain is calculated by determining first the ratio between the rise over the run and multiplying the ratio by 100%.
For Path A:
grade = (rise / run) x 100%
grade = (1414/ 3535) x 100% = 40%
<em>Answer: 40%</em>
For Path B:
grade = (rise / run) x 100%
grade = (4.26 m/ 22 m) x 100% = 19.36%
Answer: 19.36%
Answer:
250 boys attended the conference.
Step-by-step explanation:
First, divide 750 by 3 (one-third of the conference is boys) and you will get 250 (number of boys). If you wanted to find the number of girls too, you would simply double 250 to get 500 girls.
Answer:
C. unlikely
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
A probability is said to be extremely likely if it is 95% or higher, and extremely unlikely if it is 5% or lower. A probabilty higher than 50% and lower than 95% is said to be likely, and higher than 5% and lower than 50% is said to be unlikely.
In this problem, we have that:

How likely is it that a single survey would return a mean of 30%?
We have to find the pvalue of Z when X = 0.30.



has a pvalue of 0.1587.
So the correct answer is:
C. unlikely