Answer:
COP = 3.828
W' = 39.18 Kw
Explanation:
From the table A-11 i attached, we can find the entropy for the state 1 at -20°C.
h1 = 238.43 KJ/Kg
s1 = 0.94575 KJ/Kg.K
From table A-12 attached we can do the same for states 3 and 4 but just enthalpy at 800 KPa.
h3 = h4 = hf = 95.47 KJ/Kg
For state 2, we can calculate the enthalpy from table A-13 attached using interpolation at 800 KPa and the condition s2 = s1. We have;
h2 = 275.75 KJ/Kg
The power would be determined from the energy balance in state 1-2 where the mass flow rate will be expressed through the energy balance in state 4-1.
W' = m'(h2 - h1)
W' = Q'_L((h2 - h1)/(h1 - h4))
Where Q'_L = 150 kW
Plugging in the relevant values, we have;
W' = 150((275.75 - 238.43)/(238.43 - 95.47))
W' = 39.18 Kw
Formula foe COP is;
COP = Q'_L/W'
COP = 150/39.18
COP = 3.828
Answer:
A. 4WD Low
B. 4WD High
C. Safety belt
D. Check gauge
E. Oil temperature gauge
F. Left turn indicator
G. Tachometer
H. High beams
I. Speedometer
J. Right turn indicator
K. Battery voltage gauge
L. Cruise control light
M. (can't see sorry)
N. Service engine soon
O. Battery warning light
P. Airbag indicator
Q. Anti-lock brake system
R. Fuel gauge
S. Parking brake (AKA emergency brake) on
T. Low windshield washer fluid
U. Check fuel cap
V. Door ajar/open
W. Shift indicator
X. Trip odometer reset
Y. Oil pressure gauge
Z. compass/cardinal direction indicator
AA. Odometer?
Answer:
It serves as a guarantee that the contractor who wins the bid will honor the terms of the bid after the contract is signed.
Explanation:
A bid bond is a type of construction bond that protects the obligee in a construction bidding process.
A bid bond typically involves three parties:
The obligee; the owner or developer of the construction project under bid. The principal; the bidder or proposed contractor.
The surety; the agency that issues the bid bond to the principal example insurance company or bank.
A bid bond generally serves as a guarantee that the contractor who wins the bid will honor the terms of the bid after the contract is signed.
Answer:
C. Signal-to-quantization-noise ratio
Explanation:
Answer:
Explanation:
When used as nouns, schematic diagram means a plan, drawing, sketch or outline to show how something works, or show the relationships between the parts of a whole, whereas schematic means a simplified line-drawing generally used by engineers and technicians to describe and understand how a system works at an abstract level.
Hope this helped!!!