Answer:
(4,10)
Step-by-step explanation:
7-3= 4
5=5=10
The minimum cost is achieved when 150 trees are produced giving a minimum cost of $27.5
Polynomial is an expression that involves the <em>operations of addition, subtraction, multiplication of variables.</em>
Let C represent the cost for buying and caring for n trees. Given that:
C = 0.001n² - 0.3n + 50.
The minimum cost is at dC/dn = 0, hence:
dC/dn = 0.002n - 0.3
0.002n - 0.3 = 0
0.002n = 0.3
n = 150
C(150) = 0.001(150)² - 0.3(150) + 50 = 27.5
The minimum cost is achieved when 150 trees are produced giving a minimum cost of $27.5
Find out more at: brainly.com/question/25836610
Answer:
76%
Step-by-step explanation:
first use the calculator you might find the answer on it even the calculator on your own phone
sorry i know you wont understand me
Answer:
700 lbs and 3.742
Step-by-step explanation:
Given that raw materials are studied for contamination. Suppose that the number of particles of contamination per pound of material is a Poisson random variable with a mean of 0.02 particle per pound.
a) To get 14 particles of contamination we must have
expected number of pounds = 
b) Since for 700 pounds particles expected are 14 we can say in a Poisson distribution mean and variance are equal
i.e. Var (700 lbs to obtain 14 particles of contamination ) = 14
Std deviation =