12 times 4 minus 3 because the 12 represents how much is in each of the 4 cases and you minus that by 3 and you get your answer
Answer:
4/10 chance. Or 2/5. 40% chance.
Step-by-step explanation:
Answer: 72 minutes
Step-by-step explanation:
Pipe A can empty the water in 180 minutes = (180/60) =3 hours
Pipe A does 1/ 3 of the job in 1 hour.
Pipe B can empty the water in 120 minutes = (120/60) = 2 hours.
Pipe B does 1/ 2 of thejob in 1 hour.
Together they will do:
1/ 3 + 1/ 2 = 5/6
Together, both pipes will do 5/ 6 of the job in one hour.
To get the total time to completely drain the water will be:
= 60 ÷ 5/6
= 60 × 6/5
= 12 × 6
= 72 minutes
It takes 72 minutes to empty the pool.
Answer:
b) square root of 29
Step-by-step explanation:
i just took it on edge
Answer:
- <u>First blank: the equation of the line that passes through A and B</u>
<u></u>
- <u>Second blank: is a solution of the equation</u>
Explanation:
Three or more points are collinear if and only if they are on the same line, and, thus they are solutions, of the same equation of the line.
When you know two points through their coordinates you can always find the equation of the line:
You can find the slope, m, of that line by using the slope formula:
- m = rise / run = Δy / Δx = (y₂ - y₁) / (x₂ - x₁)
And then, you apply the point-slope equation:
Since you know m, x₁, and y₁, your equation is determined.
Once you have your equation, substitute the x and y coordinates with the coordinates of the point C. If, and only if, the equation is satisfied, the point C is on the same line and the three points are collinear.