We can use the formula for a parabola:

where

is the origin of the parabola and

is some constant scaling factor.
We are given that the center of the arch on the bridge is

. This is our origin. So our equation is:

Now we just need to find c. We can do this by plugging in one of the other points given:


So our final equation for the arch of the bridge is:
Answer:
b) LeBron is relatively taller because he has a larger z-score.
Step-by-step explanation:
Z-score:
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
LeBron James:
Height of 81 inches, while the average 30- to 39-year old man is 69.5 inches tall, with a standard deviation of 2.7 inches, which means that we have to find Z when 

Candace Parker:
Height of 76 inches, while the average 30- to 39-year old woman is 64.2 inches tall, with a standard deviation of 3.2 inches. This means that we have to find Z when 

Who is relatively taller?
Due to the higher z-score, LeBron James, and thus, the correct answer is given by option b.
Answer:
5.2
Step-by-step explanation:
To find the height of the plant after 7 weeks, we need to find out the equation of the line of best fit and plug in 7 for x. We already have our y - intercept, which is 1, and we have a point on the x axis for which the y coordinate is an integer, (5, 4). Since we already have the y - intercept of +1 we have y = mx + 1. Since this applies to (5,4) we can plug this in to our equation. This is then 4 = 5m + 1. Subtracting 1 from both sides, we get 3 = 5m. Dividing by 5, we receive m = 3/5. Since now we have our slope, we can plug in 7 and find out our answer. Plugging in 7 we receive, y = 3/5 * 7 + 1, which is equal to y = 4.2 + 1. This means that y = 5.2, so 5.2 is our answer.
Answer:
44 questions
Step-by-step explanation:
Part 1: She got 16 questions correct, which was 4/5 of the number of part 1 questions.
Let x = total number of questions in part 1
4/5x = 16
Divide both sides by 4/5
x = 16 ÷ 4/5
= 16 × 5/4
= 20
x = 20
There are 20 questions in part 1
She got 16 questions correct, which was 2/3 of the number of part 2 questions.
Let y = number of questions in part 2
2/3y = 16
Divide both sides by 2/3
y = 16 ÷ 2/3
= 16 × 3/2
= 24
y = 24
There are 24 questions in part 2
The total number of questions on Stephanie’s exam = part 1 + part 2
= 20 + 24
= 44 questions
Answer:
TRUE
Step-by-step explanation: