1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Nutka1998 [239]
3 years ago
7

It takes chris 30 mininutes to walk to work it takes him 1/3 of the time to drivewhat is the latesest time he can drive to work

and arrive at 8:00
Mathematics
1 answer:
kramer3 years ago
6 0
It takes Chris 10 minutes to drive, so the latest time he can leave home for work would be 7:50 a.m.
You might be interested in
How do you round the area of a circle with 3.14?
kirill115 [55]

Answer:

(This is a example since you don’t have anything to round to)

Example Answer if the radius is 4 - 50.24

Step-by-step explanation:

Example Radius : 4

Area : 3.14

We have the mulitiply 3.14 times The Example Radius 2 times because The diameter of a circle is 2 times its radius.

( 3.14 x 4 x 4) 50.24

If you know the diameter, it’s a half or 1/2 as large.

Therefore, if the radius was 4, it would be 50.24.

Youre welcome :)

7 0
2 years ago
Adina has a rectangular garden that measures 9 m wide by 13 m long. She wants to
MrRissso [65]
9*13=117
12*16=192

We increased three meters to both the length and width of the garden.
6 0
3 years ago
Read 2 more answers
155 divided by 17. .......
monitta
155 divided by 17 =
9.1176
7 0
3 years ago
Read 2 more answers
Does anyanyone know
Ksju [112]

Answer:

7x² + 4x + 32

Step-by-step explanation:

   13x²  + 7x +21

<u>-    6x² + 3x - 11        </u>

    7x²  +4x + 32

8 0
3 years ago
A small business makes 3-speed and 10-speed bicycles at two different factories. Factory A produces 16 3-speed and 20 10-speed b
GarryVolchara [31]

Answer:

Factory A should be operated 6.11 days

Factory B should be operated 6.88 days

The minimum cost for factory A is $6,110

The minimum cost for factory B is $5,504

Step-by-step explanation:

Factory A

Daily production: 16 3-speed and 20 10-speed bikes

Total daily production = 16+20 = 36 speed bikes

Order: 80 3-speed and 140 10-speed bikes

Total order = 80+140 = 220 speed bikes

Number of days = 220/36 = 6.11 days

Cost per day = $1,000

Minimum cost for 6.11 days = $1000 × 6.11 = $6,110

Factory B

Daily production: 12 3-speed and 20 10-speed bikes

Total daily production = 12+20 = 32 speed bikes

Total order = 220 speed bikes

Number of days = 220/36 = 6.88 days

Cost per day = $800

Cost for 6.88 days = $800 × 6.88 = $5,504

6 0
3 years ago
Other questions:
  • Find the side length. Round to the nearest tenth if necessary.<br> 15
    12·1 answer
  • Emily begin piano practice at 3:25 she finished at 5:00 how long did she practice​
    8·1 answer
  • How many employees worked fewer than 8 hours yesterday?
    14·2 answers
  • I NEED HELP NOW I WILL DO ANYTHING
    5·1 answer
  • Every year, for the annual school bake sale,
    10·1 answer
  • Write the operation product of m and 2
    11·1 answer
  • Suppose you are interested in selling your home and would like to clear a net value of $300,000. If you have agreed to pay your
    13·1 answer
  • What is the width of a rectangle with an area of 5/8 inches squares and a length of 10 inches.
    10·1 answer
  • a refreshment jug for the baseball team holds 20 gallons of water to make an energy drink one cup of mix is used for every 2 gal
    9·2 answers
  • 5 for every $2.50 10 for every ?​
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!