Answer:
The vertex, (1.5, 40), tells us that it takes 1.5 seconds for the ball to reach its maximum height of 40 feet.
Step-by-step explanation:
...i think..
The distance Train A travels is represented by
where d is the distance in kilometers and t is the time in hours
The speed of train A is 70 kilometer per hour
To find speed of train B use the table
find out slope
The speed of train B is 75 km per hour
The speed of the train B is more
Train B is going faster
16-20= 4 so 4/20 is 0.2 or 20%. To get percentage move decimal to the right two times :)
The first thing I did was plot the given two points: (3,0) and (0,4). I connected the two hollow dots and created a line. Then, I shaded the region below the line as mentioned in the problem. The result is show in the picture.
The detail about dashed line is important because it expresses an equality with a symbol < or >. The data points that coincide with that line is not part of the solution but just stand as a boundary, hence, I used dashed line and hollow points. If it were ≥ or ≤, then we use solid lines and dots. With that, we can already eliminate choice D.
Next, we test the inequality. Let's choose a point within the shaded region. Suppose the point is (1,0) denoted by the red dot. If it is part of the solution, then the inequality will be proven true.
<span>A. 4x-3y>-12
4(1) - 3(0) > -12
4 > -12, this is true
B. x+4y>4
1 + 4(0) > 4
1 > 4, this is not true
C. 4x-2y<-8
4(1) -2(0) < -8
4 <-8, this is not true
</span>∴The answer is A.<span>
</span>
7 million acres of Nevadas land is unfedarally owned!
Hope This Helps