Hello there,
best way to do this one is set up your story line....
4h + 8h + 50 = 164$...
let's make this easier to look at and combine like terms..
12h + 50 = 164$...
Beautiful!!! Now let's try and get the h alone?...
minus 50 to both sides...
12h = 114$..
now divide both sides by 12...
H= 9.50$/hour
Looks like you made 9.50$ an hour but Hey, at least you got that bonus ;)
Answer: The maximum revenue is $7482 . To get a maximum yield , The number of trees per acre needed is 43.
Step-by-step explanation:
Solution:
Let x represent the extra tree
So for an additional tree the yield of each tree will decrease by 4 bushels.
(80 +x)(26-4x) by expanding
2080 - 320x +26x -4x^2
Using x= -b/2a
X= 294/ -8
X= - 36.75
So apparently he currently has far too many trees per acre. To get the maximum yield , she needs to reduce the number of trees per acre by 36.75
So the number of trees per acre for maximum yield is
80-36.75
=43.25
Approximately x=43
So by reducing he get extra bushel in the tune of 174.
Total revenue= 174 ×43× 1$
=$7482
Answer:
13 and 11
Step-by-step explanation:
how is helpful
Answer:
The answer is 'The slope of g(x) is less than the slope of f(x)'
Step-by-step explanation:
Given the graphs of f(x) and g(x). we have to compare the slops of these two.
The graph of f(x) passes through the points (1,0) and (2,2)
∴ 
The graph of g(x) passes through the points (0,2) and (2,3)
∴ 
As 
This shows that the
The slope of g(x) is less than the slope of f(x).
I’m not sure sorry also it past due